Where to Next
After that, we headed on our own to Germany, where we enjoyed some beautiful views. Besides that, we did a lot of work installing new equipment.
What We Did
Work Done
- replaced the storage drives in the remaining servers from SSD to brand new NVMe
- connected 10Gbps ports for each node
- installed new networking equipment to expand our infrastructure
- upgraded the already installed servers
- as per the client's request, assembled, installed, and configured a dedicated server with Ryzen 9 9950X.
All the work was completed only by 5 AM local time. It was an intense job! Up next - the legendary CloudFest! It was suuuper interesting! So much content!




